Case Studies

Select a case study for more info...

  • Derrick Services Ltd.
    DSL

    Complete

    The Job:

    Energy Saving & Reducing Costs

    Completion:

    4 days

    fitting: 200m cable
    job: 50 x 120w warehouse strip lights
    Read case study
  • Stowen Group

    Sheringham Shoal Offshore Windfarm

    The Job:

    Ventilation control & warning system

    Completion:

    24 hrs / 3 days

    fitting: 200m cable
    job: 50 x 120w warehouse strip lights
    completion: 1 day
    Read case study
  • James Fisher
    Marine Services

    Galloper offshore wind farm

    The Job:

    Marine pedestal hookup

    Completion:

    5 days

    fitting: 200m cable
    job: 50 x 120w warehouse strip lights
    Read case study
  • Perenco

    Bordeaux House

    The Job:

    New energy efficient lighting system

    Completion:

    2 days

    fitting: 200m cable
    job: 50 x 120w warehouse strip lights
    completion: 1 day
    Read case study
  • Aggreko
    Ministry of Defence

    RAF Sculthorpe

    The Job:

    Power supply to temp site

    Completion:

    4 days

    fitting: 200m cable
    job: 50 x 120w warehouse strip lights
    completion: 1 day
    Read case study
James Fisher logo

Case Study 1

The Client

James Fisher
Marine Services

Galloper offshore wind farm

The Brief

Marine Pedestal Hookup and backup generators

The Result

Provided power to offshore wind farm workboats while docked at the Galloper OCCB.

Submit Risk Assessment Method Statement for the work carried out.

Installed a 100 Amp 3 Phase supply to a distribution board positioned on the quayside.

Install change over switch to allow for connection of the generator in the event of power failure.

Install 4 marine pedestals along the quayside at 50, 100, 150, 200-meter intervals. Each pedestal provided two 32 Amp sockets.

Earthing of structural steel and fuel tanks on the quayside.

Install Backup generators and Automatic Transfer Switch (ATS) to MCC operations electrical supply.

Provide Electrical Installation Certificate for the work carried out.

AC Electrical Installation for James Fisher
AC Electrical Installation for James Fisher
AC Electrical Installation for James Fisher
X in a circle - close pop-up
Perenco logo

Case Study 1

The Client

Perenco

The Brief

Repair and replacement of faulty lights before Perenco moved into the new premises at Peel Ports Great Yarmouth.

The Result

After speaking to the client during our site visit, I explained that repairing the existing faulty lights would be a more expensive option in the medium /long term as these lights were old, inefficient and would require regular repairs.

Based on our research, we recommended a complete lighting upgrade, providing cheaper running costs and increased energy efficiency.  We made a presentation to Perenco with a full lighting specification design and a breakdown of our installation costs.  

After the work was approved, we carried out the complete lighting upgrade in the new Perenco warehouse and workshop areas.  This involved disconnecting 112 lights fittings and replace with 36 new LED warehouse lights which vastly increased light output, whilst simultaneously significantly reducing running costs.  

AC Electrical for Perenco Warehouse Project - Before
Perenco Warehouse - before
AC Electrical for Perenco Warehouse Project - After
Perenco Warehouse - after
X in a circle - close pop-up
Aggreko logo

Case Study 1

The Client

Aggreko

Ministry of Defence - RAF Sculthorpe

The Brief

Install generator and backup generator to temporary site supply.

The Result

  • Provided RAMS ( Risk Assessment Method Statement) for the work being carried out.
  • Install 2 x 60kVA generators (1 x main runner & 1 x Back up Supply)
  • Install  TT Earth to the generators.
  • Install 63 amp Auto Transfer Switch,  1 x 15m auto start cable & 1 x 15m Battery charger cable.
  • Connect cables between generators and ATS.
  • Connect to the distribution board, connect to temporary site offices.
  • Test both generators and ATS.
  • Carry out Electrical Installation Certificate for the temporary installation.
AC Electrical for Aggreko: MOD - RAF SculthorpeAC Electrical for Aggreko: MOD - RAF Sculthorpe.AC Electrical for Aggreko: MOD - RAF SculthorpeAC Electrical for Aggreko: MOD - RAF SculthorpeAC Electrical for Aggreko: MOD - RAF Sculthorpe
X in a circle - close pop-up
Stowen Logo

Case Study 1

The Client

Stowen Group

Sheringham Shoal Offshore Wind Farm

The Brief

This project was for the Stowen Group, at Sheringham Shoal Wind Farm, and involved designing and installing a full ventilation control and warning system for the Anode Project.

The Result

  • Design and installation of full ventilation control & warning system
  • Control box with red flashing beacon installation
  • Connection to two isolators and ventilation fans
X in a circle - close pop-up

Case Study 1

The Client

DSL

Derrick Services (UK) Ltd. Great Yarmouth

The Brief

Find a solution to save energy and reduce running costs.

The Job

Danny Daniels from DSL contacted AC Electrical to talk to us about ways they can saving energy and reduce the running costs of the lighting in the communal areas of the building such as the corridors, kitchens and toilets. We carried out a site survey of the installation and looked at what was installed and what the LED equivalent would be.  To further increase energy and cost savings we proposed to install occupancy sensors in all areas to allow the lights to operate only if they were occupied and if the natural light levels required it. We were able to fully adjust the occupancy sensors to the natural light levels and time settings for each different area, ensuring lights were on only if required and for the minimum amount of time necessary before dimming down and turning off.

Over the course of four days:

  • Removed 47 light fittings
  • Rewired the lighting circuits to allow all the areas to be sensor controlled
  • Remove redundant light switches and blanked off 
  • Supplied and fitted:
  • 29 x OVIA OV74301CWB LED PANEL 30W
  • 10 X OVIA OVMS001WH MICROWAVE SENSORS
  • 10 x OVIA OV9110010/16W MICROWAVE  LED BULKHEAD 
  • 4 x OVIA OV82150 MICROWAVE  42/48/54/60W 1500MM LED BATTEN 

The Result

  • Over 50% reduction in energy and running cost compared to the original installation.

After . . .

Before . . .

X in a circle - close pop-up

Whatever your project or query, don't hesitate to get in touch. We're committed to providing service & consultancy to customers old & new, anytime.

N I C E I C - CERTIFICATION
Compex Electrical Contractors
I P A F - CERTIFIED
GLOBAL WIND ORGANISATION - CERTIFIED

Don't just take our word for it...

fake Profile 1fake Profile 1fake Profile 1
John Smith,
Owner
Inoscape Manufacturing
David Smail,
Project Manager, Galloper OWF
James Fisher Marine Services
Mark Neahn,
CEO
TechInspect
J F Moore,
Landlord
Residential & Commercial
" Recommended to us, they were an integral part of expanding our manufacturing business. Designing and installing exactly what was needed…going above what we had expected with advice and planning. "
" Whenever we use AC Electrical for a project, we know we’re working with professionals who provide excellent service during any project, including 24-hour availability. "
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Quisque ullamcorper dui eget leo facilisis facilisis.
" I wouldn’t use anyone else...
I’ve used them for over 30 years. They are always helpful and friendly, they take care of all my commercial and residential properties, including checks, maintenance, and improvements. They’re always there when I need them. "
fake Profile 1
John Smith
Owner:
Inoscape Manufacturing
" Recommended to us, they were an integral part of expanding our manufacturing business. Designing and installing exactly what was needed…going above what we had expected with advice and planning. "
Woman Testimonial place holder img
JF Moore
Landlord:
Residential & Commercial Properties
" I wouldn’t use anyone else...
I’ve used them for over 30 years. They are always helpful and friendly, they take care of all my commercial and residential properties, including checks, maintenance, and improvements. They’re always there when I need them. "
Man Testimonial Img place holder
David Smail,
Project Manager, Galloper OWF
James Fisher Marine Services
" Whenever we use AC Electrical for a project, we know we’re working with professionals who provide excellent service during any project, including 24-hour availability. "